SEC-19 • Tools, Equipment & Machinery • 29 CFR 1926.350 & 29 CFR 1910.101 & EPA Clean Air Act Section 608
Compressed Gas Cylinders, Refrigerants & Mechanical Piping Safety
Upright chaining/securing of all compressed gas cylinders (oxygen, acetylene, nitrogen, argon, CO2, refrigerants), valve protection caps during transport/storage, 20-foot oxygen/fuel separation, regulator inspection, and nitrogen pressure testing relief valves.
Mandatory OSHA & RAVS® Audit Elements Covered
Every Compressed Gas Cylinders, Refrigerants & Mechanical Piping Safety document generated by Trade Safety Manuals is pre-merged with your Company Name and Designated Safety Director and addresses these required regulatory provisions:
- Secure all compressed gas cylinders upright in an approved cylinder cart, rack, or fixed wall chain at all times during storage, transport, and use; keep valve protection caps screwed on hand-tight whenever regulators are removed
- Separate stored oxygen cylinders from fuel-gas cylinders and combustible materials (oil, grease) by a minimum of 20 feet or a 5-foot noncombustible barrier with at least a 30-minute fire-resistance rating
- Never use oil, grease, or thread tape on oxygen regulators or fittings; crack cylinder valves slowly standing to the side of the regulator gauge face
- Use only two-stage pressure regulators with functioning high/low gauges and pressure-relief safety valves when purging or leak-testing piping with dry nitrogen
Required PPE & Instant Custom Sample Download
Mandatory Personal Protective Equipment (PPE) & Controls Specified:
- Safety Glasses + Face Shield
- Leather Work Gloves (Thermal Gloves when handling liquid refrigerant)
- Safety-Toe Boots
Customize & Download Free Sample (.DOC)
Enter your company details below to download an editable Microsoft Word copy of SEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping Safety immediately:
Browse All 24 Written OSHA & RAVS® Safety Programs:
SEC-01: Injury & Illness Prevention Program (IIPP) / Corporate Safety PolicySEC-02: Fall Protection, Guardrails & Post-Fall Rescue PlanSEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO)SEC-04: Electrical Safety, Arc Flash & NFPA 70E Compliance ProgramSEC-05: Trenching, Excavation & Underground Utility ProtectionSEC-06: Permit-Required Confined Space Entry (Construction & General Industry)SEC-07: Respirable Crystalline Silica Written Exposure Control PlanSEC-08: Hazard Communication (HazCom) & GHS Safety Data Sheets ProgramSEC-09: Fire Prevention, Welding, Cutting & Hot Work Permit ProgramSEC-10: Portable Ladders, Stairways & Safe Access ProgramSEC-11: Supported & Mobile Scaffolding Safety ProgramSEC-12: Mobile Elevating Work Platforms (MEWPs) — Aerial & Scissor LiftsSEC-13: Cranes, Derricks, Rigging & Qualified Signal Person ProgramSEC-14: Personal Protective Equipment (PPE) & Hazard Assessment ProgramSEC-15: Heat Illness Prevention, Acclimatization & Hydration PlanSEC-16: Hand & Portable Power Tools, Guards & Pneumatic/Powder-Actuated ToolsSEC-17: Respiratory Protection, Medical Evaluation & Fit Testing ProgramSEC-18: Heavy Earthmoving & Mobile Equipment, Spotters & Traffic ControlSEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping SafetySEC-20: Bloodborne Pathogens, First Aid & Sewage/Biohazard Exposure ControlSEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe WeatherSEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 RecordkeepingSEC-23: Subcontractor Safety Prequalification & Multi-Employer CoordinationSEC-24: Occupational Noise Exposure & Hearing Conservation Program