SEC-03 • Energy Isolation & Electrical • 29 CFR 1926.417 & 1926.702(j) & 29 CFR 1910.147 & 1910.333(b)
Control of Hazardous Energy — Lockout / Tagout (LOTO)
Six-step energy isolation, zero-energy verification, individual lock/tag hardware requirements, group lockbox procedures, shift transfer protocols, and annual periodic inspection of energy control procedures.
Mandatory OSHA & RAVS® Audit Elements Covered
Every Control of Hazardous Energy — Lockout / Tagout (LOTO) document generated by Trade Safety Manuals is pre-merged with your Company Name and Designated Safety Director and addresses these required regulatory provisions:
- Strict "One Person, One Lock, One Key" rule using standardized, durable, uniquely keyed LOTO padlocks and tags
- Mandatory 6-step shutdown & isolation sequence: Preparation, Shutdown, Isolation, Lock/Tag Application, Stored Energy Dissipation, and Verification (Try-Start + Meter Test)
- Group LOTO lockbox coordination when multiple craft workers service a single system
- Emergency absent-employee lock removal only under documented Safety Director verification protocol
Required PPE & Instant Custom Sample Download
Mandatory Personal Protective Equipment (PPE) & Controls Specified:
- Voltage-Rated Gloves (for electrical verification)
- Arc-Rated Face Shield / Safety Glasses
- Standardized LOTO Padlocks, Hasps & Danger Tags
Customize & Download Free Sample (.DOC)
Enter your company details below to download an editable Microsoft Word copy of SEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO) immediately:
Browse All 24 Written OSHA & RAVS® Safety Programs:
SEC-01: Injury & Illness Prevention Program (IIPP) / Corporate Safety PolicySEC-02: Fall Protection, Guardrails & Post-Fall Rescue PlanSEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO)SEC-04: Electrical Safety, Arc Flash & NFPA 70E Compliance ProgramSEC-05: Trenching, Excavation & Underground Utility ProtectionSEC-06: Permit-Required Confined Space Entry (Construction & General Industry)SEC-07: Respirable Crystalline Silica Written Exposure Control PlanSEC-08: Hazard Communication (HazCom) & GHS Safety Data Sheets ProgramSEC-09: Fire Prevention, Welding, Cutting & Hot Work Permit ProgramSEC-10: Portable Ladders, Stairways & Safe Access ProgramSEC-11: Supported & Mobile Scaffolding Safety ProgramSEC-12: Mobile Elevating Work Platforms (MEWPs) — Aerial & Scissor LiftsSEC-13: Cranes, Derricks, Rigging & Qualified Signal Person ProgramSEC-14: Personal Protective Equipment (PPE) & Hazard Assessment ProgramSEC-15: Heat Illness Prevention, Acclimatization & Hydration PlanSEC-16: Hand & Portable Power Tools, Guards & Pneumatic/Powder-Actuated ToolsSEC-17: Respiratory Protection, Medical Evaluation & Fit Testing ProgramSEC-18: Heavy Earthmoving & Mobile Equipment, Spotters & Traffic ControlSEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping SafetySEC-20: Bloodborne Pathogens, First Aid & Sewage/Biohazard Exposure ControlSEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe WeatherSEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 RecordkeepingSEC-23: Subcontractor Safety Prequalification & Multi-Employer CoordinationSEC-24: Occupational Noise Exposure & Hearing Conservation Program