SEC-22 • Core Management & Leadership • 29 CFR Part 1904 (1904.1–1904.46) & 29 CFR 1904.39 (8-Hour Fatality / 24-Hour Hospitalization Reporting)
Incident Investigation, Root Cause Analysis & OSHA 300 Recordkeeping
Immediate scene preservation, 24-hour supervisor incident & near-miss reporting, 5-Why root cause analysis, OSHA 301/300/300A log maintenance (Feb 1 – Apr 30 posting), 8-hour fatality / 24-hour hospitalization/amputation/eye-loss reporting, and Return-to-Work light duty.
Mandatory OSHA & RAVS® Audit Elements Covered
Every Incident Investigation, Root Cause Analysis & OSHA 300 Recordkeeping document generated by Trade Safety Manuals is pre-merged with your Company Name and Designated Safety Director and addresses these required regulatory provisions:
- Report all work-related injuries, illnesses, property damage, and near-misses to the immediate Supervisor and Safety Director immediately (written Incident Report completed within 24 hours)
- Report any work-related fatality to OSHA (1-800-321-OSHA) within 8 hours, and any in-patient hospitalization, amputation, or loss of an eye within 24 hours (shorter windows in Cal/OSHA: 8 hours for serious injury)
- Record recordable injuries/illnesses on OSHA Form 300 and Form 301 within 7 calendar days; post certified OSHA Form 300A Summary from February 1 through April 30 each year
- Conduct a non-punitive Root Cause Analysis (5-Why methodology) for every incident and near-miss to implement engineering or administrative corrective actions
Required PPE & Instant Custom Sample Download
Mandatory Personal Protective Equipment (PPE) & Controls Specified:
- Barricade Tape & Scene Documentation Camera
Customize & Download Free Sample (.DOC)
Enter your company details below to download an editable Microsoft Word copy of SEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 Recordkeeping immediately:
Browse All 24 Written OSHA & RAVS® Safety Programs:
SEC-01: Injury & Illness Prevention Program (IIPP) / Corporate Safety PolicySEC-02: Fall Protection, Guardrails & Post-Fall Rescue PlanSEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO)SEC-04: Electrical Safety, Arc Flash & NFPA 70E Compliance ProgramSEC-05: Trenching, Excavation & Underground Utility ProtectionSEC-06: Permit-Required Confined Space Entry (Construction & General Industry)SEC-07: Respirable Crystalline Silica Written Exposure Control PlanSEC-08: Hazard Communication (HazCom) & GHS Safety Data Sheets ProgramSEC-09: Fire Prevention, Welding, Cutting & Hot Work Permit ProgramSEC-10: Portable Ladders, Stairways & Safe Access ProgramSEC-11: Supported & Mobile Scaffolding Safety ProgramSEC-12: Mobile Elevating Work Platforms (MEWPs) — Aerial & Scissor LiftsSEC-13: Cranes, Derricks, Rigging & Qualified Signal Person ProgramSEC-14: Personal Protective Equipment (PPE) & Hazard Assessment ProgramSEC-15: Heat Illness Prevention, Acclimatization & Hydration PlanSEC-16: Hand & Portable Power Tools, Guards & Pneumatic/Powder-Actuated ToolsSEC-17: Respiratory Protection, Medical Evaluation & Fit Testing ProgramSEC-18: Heavy Earthmoving & Mobile Equipment, Spotters & Traffic ControlSEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping SafetySEC-20: Bloodborne Pathogens, First Aid & Sewage/Biohazard Exposure ControlSEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe WeatherSEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 RecordkeepingSEC-23: Subcontractor Safety Prequalification & Multi-Employer CoordinationSEC-24: Occupational Noise Exposure & Hearing Conservation Program