SEC-21 • Core Management & Leadership • 29 CFR 1926.35 & 1926.50 & 29 CFR 1910.38
Emergency Action Plan (EAP), Medical Evacuation & Severe Weather
Alarm signals (3 air-horn blasts), primary/secondary evacuation routes and muster points, headcount accountability by foremen, nearest hospital/trauma center posting, 911 GPS address protocol, severe weather/lightning 30-30 rule, and spill response.
Mandatory OSHA & RAVS® Audit Elements Covered
Every Emergency Action Plan (EAP), Medical Evacuation & Severe Weather document generated by Trade Safety Manuals is pre-merged with your Company Name and Designated Safety Director and addresses these required regulatory provisions:
- Post the site-specific Emergency Action Plan at the jobsite board/gangbox before work begins, including the exact physical street address/GPS coordinates, nearest Level I/II Hospital map, and Emergency Coordinator phone numbers
- Establish a distinctive jobsite emergency alarm (e.g., 3 long air-horn blasts or site siren) and designated Primary and Secondary Assembly Muster Points
- Require Foremen to conduct an immediate crew headcount using the daily sign-in roster upon reaching the muster point and report any missing personnel to Incident Command
- Suspend outdoor rooftop, crane, scaffold, and open-trench work immediately when lightning is within 10 miles (30 seconds flash-to-bang) or high winds exceed 25–30 mph (crane/MEWP manufacturer limits)
Required PPE & Instant Custom Sample Download
Mandatory Personal Protective Equipment (PPE) & Controls Specified:
- High-Visibility Vest
- Air Horn / Two-Way Radio
- ANSI Z308.1 Class B First Aid Kit & 20-lb ABC Fire Extinguisher
Customize & Download Free Sample (.DOC)
Enter your company details below to download an editable Microsoft Word copy of SEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe Weather immediately:
Browse All 24 Written OSHA & RAVS® Safety Programs:
SEC-01: Injury & Illness Prevention Program (IIPP) / Corporate Safety PolicySEC-02: Fall Protection, Guardrails & Post-Fall Rescue PlanSEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO)SEC-04: Electrical Safety, Arc Flash & NFPA 70E Compliance ProgramSEC-05: Trenching, Excavation & Underground Utility ProtectionSEC-06: Permit-Required Confined Space Entry (Construction & General Industry)SEC-07: Respirable Crystalline Silica Written Exposure Control PlanSEC-08: Hazard Communication (HazCom) & GHS Safety Data Sheets ProgramSEC-09: Fire Prevention, Welding, Cutting & Hot Work Permit ProgramSEC-10: Portable Ladders, Stairways & Safe Access ProgramSEC-11: Supported & Mobile Scaffolding Safety ProgramSEC-12: Mobile Elevating Work Platforms (MEWPs) — Aerial & Scissor LiftsSEC-13: Cranes, Derricks, Rigging & Qualified Signal Person ProgramSEC-14: Personal Protective Equipment (PPE) & Hazard Assessment ProgramSEC-15: Heat Illness Prevention, Acclimatization & Hydration PlanSEC-16: Hand & Portable Power Tools, Guards & Pneumatic/Powder-Actuated ToolsSEC-17: Respiratory Protection, Medical Evaluation & Fit Testing ProgramSEC-18: Heavy Earthmoving & Mobile Equipment, Spotters & Traffic ControlSEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping SafetySEC-20: Bloodborne Pathogens, First Aid & Sewage/Biohazard Exposure ControlSEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe WeatherSEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 RecordkeepingSEC-23: Subcontractor Safety Prequalification & Multi-Employer CoordinationSEC-24: Occupational Noise Exposure & Hearing Conservation Program