SEC-15 • Industrial Hygiene & Occupational Health • OSHA NEP on Outdoor/Indoor Heat / Title 8 CCR §3395–3396 / WAC 296-62-095 & OSH Act Section 5(a)(1) General Duty Clause / Proposed 29 CFR 1910.148
Heat Illness Prevention, Acclimatization & Hydration Plan
Potable cool water supply (1 quart per worker per hour), mandatory shade/cool-down areas at ≥80°F, high-heat procedures at ≥90°F/95°F (buddy system & mandatory rest breaks), 7–14 day new/returning worker acclimatization schedule, and heat stroke medical emergency response.
Mandatory OSHA & RAVS® Audit Elements Covered
Every Heat Illness Prevention, Acclimatization & Hydration Plan document generated by Trade Safety Manuals is pre-merged with your Company Name and Designated Safety Director and addresses these required regulatory provisions:
- Provide fresh, pure, suitably cool potable drinking water as close as practicable to work areas at no cost (minimum 1 quart / 32 oz per employee per hour for the entire shift)
- Erect open, ventilated shade (or air-conditioned cool-down area) whenever ambient temperature reaches or exceeds 80°F, accommodating all workers on rest/meal periods without sitting directly on the ground
- Implement High-Heat Procedures at ≥90°F/95°F: mandatory buddy system observation, pre-shift heat safety briefing, constant supervisor communication, and preventative cool-down rest breaks (minimum 10 minutes every 2 hours)
- Closely observe newly hired or returning employees during a 14-day acclimatization period (20% initial heat exposure scaling by ≤20% per day); treat any confusion, slurred speech, or altered mental state as a life-threatening Heat Stroke emergency (call 911 + rapid ice/cold-water immersion)
Required PPE & Instant Custom Sample Download
Mandatory Personal Protective Equipment (PPE) & Controls Specified:
- Breathable Light-Colored Work Apparel
- Hard Hat Brim Shade / Cooling Neck Towel
- Insulated Water Cooler & Electrolyte Replenishment
Customize & Download Free Sample (.DOC)
Enter your company details below to download an editable Microsoft Word copy of SEC-15: Heat Illness Prevention, Acclimatization & Hydration Plan immediately:
Browse All 24 Written OSHA & RAVS® Safety Programs:
SEC-01: Injury & Illness Prevention Program (IIPP) / Corporate Safety PolicySEC-02: Fall Protection, Guardrails & Post-Fall Rescue PlanSEC-03: Control of Hazardous Energy — Lockout / Tagout (LOTO)SEC-04: Electrical Safety, Arc Flash & NFPA 70E Compliance ProgramSEC-05: Trenching, Excavation & Underground Utility ProtectionSEC-06: Permit-Required Confined Space Entry (Construction & General Industry)SEC-07: Respirable Crystalline Silica Written Exposure Control PlanSEC-08: Hazard Communication (HazCom) & GHS Safety Data Sheets ProgramSEC-09: Fire Prevention, Welding, Cutting & Hot Work Permit ProgramSEC-10: Portable Ladders, Stairways & Safe Access ProgramSEC-11: Supported & Mobile Scaffolding Safety ProgramSEC-12: Mobile Elevating Work Platforms (MEWPs) — Aerial & Scissor LiftsSEC-13: Cranes, Derricks, Rigging & Qualified Signal Person ProgramSEC-14: Personal Protective Equipment (PPE) & Hazard Assessment ProgramSEC-15: Heat Illness Prevention, Acclimatization & Hydration PlanSEC-16: Hand & Portable Power Tools, Guards & Pneumatic/Powder-Actuated ToolsSEC-17: Respiratory Protection, Medical Evaluation & Fit Testing ProgramSEC-18: Heavy Earthmoving & Mobile Equipment, Spotters & Traffic ControlSEC-19: Compressed Gas Cylinders, Refrigerants & Mechanical Piping SafetySEC-20: Bloodborne Pathogens, First Aid & Sewage/Biohazard Exposure ControlSEC-21: Emergency Action Plan (EAP), Medical Evacuation & Severe WeatherSEC-22: Incident Investigation, Root Cause Analysis & OSHA 300 RecordkeepingSEC-23: Subcontractor Safety Prequalification & Multi-Employer CoordinationSEC-24: Occupational Noise Exposure & Hearing Conservation Program